More Deck Progress

The deck was a bit stalled out when Brady was back at work, and he managed to have a couple of fairly long sick days in the middle there. So for those reasons, its been almost a week since we last got out there and got our hands dirty. Today, we broke the cycle.

I got my legs waxed in the early afternoon, grabbed some coffees, and came home to Brady and Laela working on the deck. Dekker had opted to stay inside to play Lego, and the little boys were napping. I went inside and invited Dekker to join three three of us outside, but he declined. He insisted that he really wanted to play Lego. I got his jacket out of the closet and told him it was on the stairs if he changed his mind. Luckily, I hadn’t been out with Brady and Laela for too long at all before be decided to join us. Woot!

Due to the great desire for our deck to look as good as possible, I’ve been fairly intimidated to work on too much of it myself. My husband is the carpenter, literally, in the relationship, and I don’t want to mess up something he could do perfectly himself. But I’m getting sad that I haven’t played as much of a role in it as I originally had wanted to. Conveniently, installing the deck boards is something I am capable of doing pretty risk-free. We are using hidden fasteners to hold our composite decking on, so none of my screw holds will show, which is pretty comforting to me.

Dekker and Laela sat by the stairs, or played around in the dirt, and made up games while Brady and I set up a good system for me to comfortably work on the decking itself.

Of course, once I was confident in my role and was in a good groove, I made a quick stop inside to check on my nappers and both were awake. Because I can’t just put Solly down in the dirt, and its pretty windy and chilly on and off, I can’t revisit my post on the deck. I really like hanging out with Solly and Ro inside, don’t get me wrong, but I’m a bit sad to leave a job I can finally do. Merp.

The evening will only get better though! Jerilee is coming for the first time in at least three weeks, which is CRAZY but true. That will be a definite high point for the day. As was my leg wax with my fave waxing girl, my short chance at the deck, and hanging out with my family. Lots of things to be thankful for.

Hopefully that deck is done soon! We are SO ready for that! Just deck boards left, and the railings are all built and waiting in our garage to be installed. Its going to happen!!